Pluvial Cube

Case Studies

GAS PROTECTION STRUCTURES

  • Independent assessment of available and suitable systems to ensure optimum design, longevity, future flexibility and cost effectiveness.
  • Assessment of risks, selection of passive and mechanical venting system based on foundation layout and construction sequence, design layout including construction drawings, details and specifications, full PI insurance on design.
  • Provision of specialist sub-contractor, all associated materials, independent construction monitoring, membrane and venting system tests and certification, construction guarantees.

Related Work Case Studies